{"id":455,"date":"2018-11-01T05:55:43","date_gmt":"2018-11-01T05:55:43","guid":{"rendered":"http:\/\/romd.socialistmodernism.com\/?p=455"},"modified":"2019-02-09T06:50:31","modified_gmt":"2019-02-09T06:50:31","slug":"complexul-comercial-buftea","status":"publish","type":"post","link":"http:\/\/romd.socialistmodernism.com\/index.php\/2018\/11\/01\/complexul-comercial-buftea\/","title":{"rendered":"Complexul Comercial Buftea"},"content":{"rendered":"<ul>\n<li>Construit \u00een 1973. Arhitec\u021bi: Dinu Antonescu, Nicolae Leca, Gabriela Con\u021bescu<\/li>\n<li>Built in 1973. Architects: Dinu Antonescu, Nicolae Leca, Gabriela Contescu<\/li>\n<\/ul>\n<p><!--more--><\/p>\n<p>Pentru multe lucr\u0103ri din jude\u021bul Ilfov s-au folosit proiecte tip, refolosibile, sau sec\u021biuni tip, \u00eens\u0103 au existat numeroase cazuri c\u00e2nd a fost necesar\u0103 reg\u00e2ndirea integral\u0103, sub forma unui proiect unicat, \u00een special la lucr\u0103rile dedicate ora\u0219elor care aveau teme deosebite \u0219i condi\u021bii de termen impuse. O astfel de lucrare demn\u0103 de remarcat este Complexul comercial \u0219i de deservire Buftea, elaborat de Institutul de Proiect\u0103ri Ilfov. Ast\u0103zi edificiul \u00ee\u0219i p\u0103streaz\u0103 \u00een linii mari volumetria, \u00eens\u0103 aspectul exterior a fost mutilat prin lucr\u0103rile de \u00eentre\u021binere a fa\u021badei, coloristica original\u0103 fiind afectat\u0103 de tencuiala decorativ\u0103 amprentat\u0103 \u00een bej. Acoperi\u0219ul de tip teras\u0103 necirculabil\u0103 a fost \u00eenlocuit cu un acoperi\u0219 cu \u0219arpant\u0103 din lemn \u0219i \u00eenvelitoare din tabl\u0103.<\/p>\n<hr \/>\n<p>Many buildings in Ilfov County were planned using standard, reusable designs, or standard sections. But there were also many cases when a project required complete rethinking and a unique design, especially in cities with special architecture themes and strict deadline conditions. Such a remarkable work was the commercial and service complex in Buftea, created by the Ilfov Design Institute. Today, the building preserves most of the original volumetry, but its aspect was altered by maintenance works on the fa\u00e7ade. The original color was replaced by a beige decorative stamped plaster. The flat roof, an inaccessible terrace, was replaced by a steep roof \u2013 a timber truss and a metal sheet. <span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construit \u00een 1973. Arhitec\u021bi: Dinu Antonescu, Nicolae Leca, Gabriela Con\u021bescu Built in 1973. Architects: Dinu Antonescu, Nicolae Leca, Gabriela Contescu<\/p>\n","protected":false},"author":1,"featured_media":456,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[14,7],"tags":[],"class_list":["post-455","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-commercial-and-service-facilities-romania","category-romania"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"http:\/\/romd.socialistmodernism.com\/wp-content\/uploads\/2018\/11\/DSCF2621.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pat5AA-7l","_links":{"self":[{"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/posts\/455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/comments?post=455"}],"version-history":[{"count":2,"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/posts\/455\/revisions"}],"predecessor-version":[{"id":1273,"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/posts\/455\/revisions\/1273"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/media\/456"}],"wp:attachment":[{"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/media?parent=455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/categories?post=455"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/romd.socialistmodernism.com\/index.php\/wp-json\/wp\/v2\/tags?post=455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}